Well, in the 9 hour span between leaving for work this morning, and when I came home, it did 6 jobs.
I have a lot of TBreds, but they have to split time w UD as I said.
So, there was 39 jobs done between leaving for work and coming home. This machine did 6 of them. In other words about 15% of the period's output. There is 15 or 16 machines running here.
Time to go into the BIOS and crank that machine up!
PS Thanks, you guys. Pedalling as fast as I can.